Project Details
Abstract
Presently, climate change due to the overuse of fossil fuel has become a series issue that the human
being worldwide must face. To alleviate the growth of global greenhouse gas, promotion of renewable
energy generation and energy conservation are the global trends. Intelligent buildings, employing advanced
communication and control technique, can boost power consumption efficiency. However, due to the habit
discrepancy between the power customers as well as the continuous increase in power consumption, the
promotion of the demand-side renewable energy generation and the reduction of power transmission loss
are the most economic and effective strategies to attain energy saving and carbon reduction. This project
plans to achieve these goals in two years. In the First Phase, a 500VAR wall receptacle plugged power
factor corrector (PFC) will be developed to reduce the reactive current in house wiring to avoid fire caused
by overload condition. In addition, a 3kVAR switch box plugged PFC will be designed to improve
distribution loss. The PFCs, with the current-sourced inverter based structure, can inject reactive current
according to the load demand regardless of the voltage level. The control of the PFC will be realized by a
digital CPLD chip which is a prototypal standard application specific integrated circuit (ASIC). In the
Second Phase, a 3kW grid tied inverter for wind and solar power generation will be developed in the
vicinity of the load. A DSP-based microcontroller, featuring with the flexibility of easy programming, will
be adopted to carry out the grid synchronism and maximum power point tracking (MPPT) algorithms.
Finally, we will integrate the prior achievements to a virtual distribution power system in order to verify
the effectiveness of energy conservation and line loss reduction contributed by the proposed demand-side
PFC and renewable energy generation system. It is expected that the proposed system can reduce line loss
of 1.5TWh/year and fossil fuel based power generation of 3.1TWh/year when the power generation
provided by the demand-side renewable energy system achieves 5% of the total loading of the meter rate
lighting customers in Taiwan.
Project IDs
Project ID:PB10108-2652
External Project ID:NSC101-2221-E182-069
External Project ID:NSC101-2221-E182-069
| Status | Finished |
|---|---|
| Effective start/end date | 01/08/12 → 31/07/13 |