A mathematical model on an economic lot scheduling problem with shifting process and joint material replenishment

Dah Chuan Gong, Jhin Yong Lin, Gary C. Lin, Wen Na Ma

Research output: Chapter in Book/Report/Conference proceedingConference contributionpeer-review

1 Scopus citations

Abstract

This paper focuses on developing a mathematical model for solving the Economic Lot Scheduling Problem (ELSP) under an imperfect (shifting) process that includes joint material replenishment, in-production screening process, imperfect rework process, scraps and shortage. The Common Cycle (CC) approach is applied for the problem formulation. Although this paper only demonstrates the first step, further research works will be on conducting effective problem solving procedures.

Original languageEnglish
Title of host publicationIEEE International Conference on Industrial Engineering and Engineering Management
PublisherIEEE Computer Society
Pages1219-1222
Number of pages4
ISBN (Electronic)9781479909865
DOIs
StatePublished - 18 11 2014
Externally publishedYes
Event2013 IEEE International Conference on Industrial Engineering and Engineering Management, IEEM 2013 - Bangkok, Thailand
Duration: 10 12 201313 12 2013

Publication series

NameIEEE International Conference on Industrial Engineering and Engineering Management
ISSN (Print)2157-3611
ISSN (Electronic)2157-362X

Conference

Conference2013 IEEE International Conference on Industrial Engineering and Engineering Management, IEEM 2013
Country/TerritoryThailand
CityBangkok
Period10/12/1313/12/13

Bibliographical note

Publisher Copyright:
© 2013 IEEE.

Keywords

  • Economic lot scheduling problem
  • raw material replenishment
  • shifting process

Fingerprint

Dive into the research topics of 'A mathematical model on an economic lot scheduling problem with shifting process and joint material replenishment'. Together they form a unique fingerprint.

Cite this