Abstract
This paper focuses on developing a mathematical model for solving the Economic Lot Scheduling Problem (ELSP) under an imperfect (shifting) process that includes joint material replenishment, in-production screening process, imperfect rework process, scraps and shortage. The Common Cycle (CC) approach is applied for the problem formulation. Although this paper only demonstrates the first step, further research works will be on conducting effective problem solving procedures.
Original language | English |
---|---|
Title of host publication | IEEE International Conference on Industrial Engineering and Engineering Management |
Publisher | IEEE Computer Society |
Pages | 1219-1222 |
Number of pages | 4 |
ISBN (Electronic) | 9781479909865 |
DOIs | |
State | Published - 18 11 2014 |
Externally published | Yes |
Event | 2013 IEEE International Conference on Industrial Engineering and Engineering Management, IEEM 2013 - Bangkok, Thailand Duration: 10 12 2013 → 13 12 2013 |
Publication series
Name | IEEE International Conference on Industrial Engineering and Engineering Management |
---|---|
ISSN (Print) | 2157-3611 |
ISSN (Electronic) | 2157-362X |
Conference
Conference | 2013 IEEE International Conference on Industrial Engineering and Engineering Management, IEEM 2013 |
---|---|
Country/Territory | Thailand |
City | Bangkok |
Period | 10/12/13 → 13/12/13 |
Bibliographical note
Publisher Copyright:© 2013 IEEE.
Keywords
- Economic lot scheduling problem
- raw material replenishment
- shifting process