Abstract
This paper examines the no-wait flowshop manufacturing cell scheduling problem (FMCSP) with sequence-dependent family setup times. To the best of our knowledge, the present study is among the first to investigate FMSCPs with no-wait consideration, though it is a necessary production constraint in many real-world applications. In view of the strongly NP-hard nature of this problem, three metaheuristic-based algorithms were proposed and empirically evaluated for effectively finding optimal schedules. The experimental results demonstrate that the proposed algorithms are effective and efficient at finding good quality solutions for the FMCSP with makespan criterion.
| Original language | English |
|---|---|
| Pages (from-to) | 671-682 |
| Number of pages | 12 |
| Journal | International Journal of Advanced Manufacturing Technology |
| Volume | 58 |
| Issue number | 5-8 |
| DOIs | |
| State | Published - 01 2012 |
| Externally published | Yes |
UN SDGs
This output contributes to the following UN Sustainable Development Goals (SDGs)
-
SDG 9 Industry, Innovation, and Infrastructure
Keywords
- Flowshop manufacturing cell scheduling
- No-wait
- Sequence-dependent family setups
Fingerprint
Dive into the research topics of 'Metaheuristics for scheduling a no-wait flowshop manufacturing cell with sequence-dependent family setups'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver