Optimization of component placement scheduling for SMT assemblies

  • C. H. Kuo*
  • , M. D. Jeng
  • , J. J. Wing
  • , T. H. Wang
  • *Corresponding author for this work

Research output: Chapter in Book/Report/Conference proceedingConference contributionpeer-review

Abstract

The surface mounting of electronic component is the major manufacturing technology for the electronic products in the last decade. The surface mounting technology (SMT) is an assembly process that assembles the surface mountable component (SMC) and the printed circuit board (PCB) together. The SMT mounter is an automatic assembly machine that processes the SMT assemblies in terms of the optical positioning and robotic handling. The SMT assembly consists of calibrating printed circuit board (PCB); vacuuming components form feeder stations; compensating the orientation of the vacuumed surface mountable component (SMC); and finally placing SMC chips on the PCB. In order to increase the throughput, the synchronous batch vacuuming of SMC components is designed. In addition, different types of component feeding and mixing in each batch increase the difficulties of finding the best component mounting sequence. In this paper, the optimal component placement scheduler is desired to perform higher assembly performance and to reduce the cycle time. The proposed optimal component placement scheduler is developed based on the rule based heuristic search approach. In addition, to evaluate the cycle time of each heuristic search, the route oriented Petri nets (ROPN) based SMT assembly models are constructed. The optimal component placement scheduler can be further determined in terms of evaluating the ROPN SMT assembly models. Finally, the practical test PCB board data is discussed in this paper.

Original languageEnglish
Title of host publicationProgress on Advanced Manufacture for Micro/Nano Technology 2005 - Proceedings of the 2005 International Conference on Advanced Manufacture
PublisherTrans Tech Publications Ltd
Pages1123-1128
Number of pages6
EditionPART 2
ISBN (Print)0878499903, 9780878499908
DOIs
StatePublished - 2006
Event2005 International Conference on Advanced Manufacture, ICAM2005 - Taipei, R.O.C., Taiwan
Duration: 28 11 200502 12 2005

Publication series

NameMaterials Science Forum
NumberPART 2
Volume505-507
ISSN (Print)0255-5476
ISSN (Electronic)1662-9752

Conference

Conference2005 International Conference on Advanced Manufacture, ICAM2005
Country/TerritoryTaiwan
CityTaipei, R.O.C.
Period28/11/0502/12/05

Keywords

  • Cycle time evaluation
  • Optimal component placement scheduler
  • Production modeling
  • Route oriented Petri net
  • Surface mounting technology

Fingerprint

Dive into the research topics of 'Optimization of component placement scheduling for SMT assemblies'. Together they form a unique fingerprint.

Cite this