Single Machine Scheduling Problems With Sequence-dependent Setup Times and Precedence Delays

Shih-Wei Lin, Kuo-Ching Ying

Research output: Contribution to journalJournal Article peer-review

Abstract

<div data-language="eng" data-ev-field="abstract">Sequence-dependent setup times (SDSTs) and delayed precedence (DP) occur commonly in various manufacturing settings. This study investigated the single machine scheduling problem with SDSTs and DP constraints arising in an amplifier assembly company. A mixed-integer linear programming model and a lean iterated greedy (LIG) algorithm is proposed to search for the best job sequence with minimum makespan. Based on the characteristic of delayed precedence constraints of the problem, the proposed LIG algorithm implements a straightforward but effective lean construction mechanism, which can keep the search process within the feasible solution space and quickly converge toward the (near-) global optimum. Computational results reveal that LIG significantly outperforms the state-of-the-art algorithm in terms of solution quality and computational efficiency. This study mainly contributes to providing a simple, effective, and efficient algorithm that can facilitate industrial applications and act as a new benchmark approach for future research.<br/></div> &copy; 2021, CC BY.
Original languageAmerican English
JournalResearch Square
DOIs
StatePublished - 2021

Keywords

  • Benchmarking
  • Industrial research
  • Integer programming
  • Machinery
  • Manufacture
  • Scheduling
  • Scheduling algorithms
  • Delayed precedence
  • Iterated greedy algorithm
  • Job sequences
  • Manufacturing setting
  • Minimum makespan
  • Mixed integer linear programming model
  • Precedence constraints
  • Sequence-dependent setup time
  • Single machine scheduling problems