Strategic Workforce Planning for Production of Prefabricated Bathroom Units: An Advanced Markovian Approach

Jinchi Han, Chen Chen*, Robert Lee Kong Tiong, Kan Wu, Daryl Kok Hoong Chew

*Corresponding author for this work

Research output: Contribution to journalJournal Article peer-review

Abstract

Producing prefabricated bathroom units (PBUs) involves a dry installation method that heavily relies on human labor. Therefore, strategically accomplishing efficient and agile workforce planning emphasizes the critical significance. However, previous studies that address workforce planning often overlook the long-term stochastic effects and assume a homogeneous workforce for the sake of computational simplicity. To overcome these limitations, this study adopts the Markovian approach to establish an explicit relationship between workforce cost and cycle time, considering a heterogeneous workforce and uncertain human-caused events. The proposed model has a hierarchical structure that addresses the behavioral tendencies that drive task allocation at the individual level and the aggregate effect of manpower allocation at the operation level. By integrating Little's law in queuing theory and metaheuristics optimization, the cycle time can be calculated while searching for the optimal workforce arrangement configuration. The study cross-validated the computational results with empirical data from a precast factory in Singapore and conducted a sensitivity analysis to verify the reliability. The results show that cross-training workers to multiple skills can lead to significant time savings, with a maximum of roughly 23 h saved in PBU cycle time. Ultimately, this research contributes to the body of knowledge by proposing a strategic workforce planning model that accounts for a heterogeneous workforce and uncertain human-caused events. It utilizes a partial cross-training configuration strategy to maximize productivity and flexibility for PBU production.

Original languageEnglish
Article number04024097
JournalJournal of Construction Engineering and Management
Volume150
Issue number8
DOIs
StatePublished - 01 08 2024

Bibliographical note

Publisher Copyright:
© 2024 American Society of Civil Engineers.

Keywords

  • Markov Chains
  • Offsite construction
  • Prefabricated bathroom unit (PBU)
  • Strategic planning
  • Workforce planning