跳至主導覽 跳至搜尋 跳過主要內容

A unified view on planning, scheduling and dispatching for a factory

  • Kan Wu
  • , Yichi Shen*
  • *此作品的通信作者
  • National University of Singapore

研究成果: 期刊稿件 › 文章 › 同行評審

7 引文 斯高帕斯(Scopus)

摘要

In a smart factory, the decisions of planning, scheduling and dispatching are made based on the real time information through Internet-of-Things. To ensure the organization objective can be carried out through different levels faithfully, planning, scheduling and dispatching should be considered through a cyber physical production system in an integrated manner. To support the implementation of a smart factory, their definitions have to be given through a unified view. The distinction between planning and scheduling is given based on microeconomics and queueing theory. The distinction between scheduling and dispatching is analyzed from the viewpoint of computational complexity and hierarchical decomposition. Based on the elasticity of price and capacity, planning can be separated into demand planning or capacity planning. Scheduling period is the time horizon where price and average production costs are insensitive to the production rate. The critical roles of the master production schedule and throughput targets in job scheduling have been explained through the concept of hierarchical decomposition. Dispatching is the last layer of scheduling in the hierarchical decomposition.

原文英語
文章編號101188
期刊Advanced Engineering Informatics
卷46
DOIs
出版狀態已出版 - 10 2020

文獻附註

Publisher Copyright:
© 2020 Elsevier Ltd

UN SDG

此研究成果有助於以下永續發展目標

  1. SDG9 工業、創新基礎建設
    SDG9 工業、創新基礎建設

指紋

深入研究「A unified view on planning, scheduling and dispatching for a factory」主題。共同形成了獨特的指紋。

引用此