跳至主導覽 跳至搜尋 跳過主要內容

Approximate packet delay analysis for IEEE 802.16 networks

  • Chen Nien Tsai*
  • , Kai Wei Ke
  • , Ho Ting Wu
  • *此作品的通信作者
  • National Taipei University of Technology

研究成果: 圖書/報告稿件的類型 › 會議稿件 › 同行評審

摘要

Supporting QoS is one of notable features in IEEE 802.16 networks. In this study, we used the queuing-theoretic approach to model the uplink air interface of IEEE 802.16 networks as M/D b /1 queues. The justification for this modeling argument was given in the paper. The average queuing delay and system delay were derived with embedded Markov chain technique. We also pointed out that the created Markov chain exhibits geometric tail behavior so that the Markov chain can be solved more efficient. The analytical results were verified through computer simulations. The derived results would be supporting the design of packet scheduling or admission control.

原文英語
主出版物標題Materials Science and Information Technology, MSIT2011
頁面5063-5067
頁數5
DOIs
出版狀態已出版 - 2012
對外發佈是
事件2011 International Conference on Material Science and Information Technology, MSIT2011 - Singapore, 新加坡
持續時間: 16 09 2011 → 18 09 2011

出版系列

名字Advanced Materials Research
卷433-440
ISSN(列印)1022-6680

Conference

Conference2011 International Conference on Material Science and Information Technology, MSIT2011
國家/地區新加坡
城市Singapore
期間16/09/11 → 18/09/11

指紋

深入研究「Approximate packet delay analysis for IEEE 802.16 networks」主題。共同形成了獨特的指紋。

引用此