Economic Lot Scheduling Problem with two Imperfect Key Modules

Filemon Yoga Adhisatya*, The Jin Ai, Dah Chuan Gong

*此作品的通信作者

研究成果: 期刊稿件文章同行評審

1 引文 斯高帕斯(Scopus)

摘要

This paper considers an Economic Lot Scheduling Problem (ELSP) with two imperfect Key Modules (KMs), in which extending similar work on the Economic Production Quantity scope. It is assumed that each KM has its own probability to shift from in-control state to out-of-control state. When the production shifts to out-of-control state, it starts to produce defected items. The problem in this paper is defined as finding the cycle times for several items under ELSP with two KMs context in order to minimize the total cost covering holding cost, setup cost and quality-related cost. A series of modelling was done in order to develop the formula and algorithms to solve the cycle time T under the Independent Solution (IS) and Common Cycle (CC) approach. A numerical illustration is given based on the modified Bomberger (1966) stamping problem.

原文英語
頁(從 - 到)30-37
頁數8
期刊Procedia Manufacturing
4
DOIs
出版狀態已出版 - 2015

文獻附註

Publisher Copyright:
© 2015 The Authors

指紋

深入研究「Economic Lot Scheduling Problem with two Imperfect Key Modules」主題。共同形成了獨特的指紋。

引用此