Y1 - 2015
N2 - This paper considers an Economic Lot Scheduling Problem (ELSP) with two imperfect Key Modules (KMs), in which extending similar work on the Economic Production Quantity scope. It is assumed that each KM has its own probability to shift from in-control state to out-of-control state. When the production shifts to out-of-control state, it starts to produce defected items. The problem in this paper is defined as finding the cycle times for several items under ELSP with two KMs context in order to minimize the total cost covering holding cost, setup cost and quality-related cost. A series of modelling was done in order to develop the formula and algorithms to solve the cycle time T under the Independent Solution (IS) and Common Cycle (CC) approach. A numerical illustration is given based on the modified Bomberger (1966) stamping problem.
AB - This paper considers an Economic Lot Scheduling Problem (ELSP) with two imperfect Key Modules (KMs), in which extending similar work on the Economic Production Quantity scope. It is assumed that each KM has its own probability to shift from in-control state to out-of-control state. When the production shifts to out-of-control state, it starts to produce defected items. The problem in this paper is defined as finding the cycle times for several items under ELSP with two KMs context in order to minimize the total cost covering holding cost, setup cost and quality-related cost. A series of modelling was done in order to develop the formula and algorithms to solve the cycle time T under the Independent Solution (IS) and Common Cycle (CC) approach. A numerical illustration is given based on the modified Bomberger (1966) stamping problem.
KW - Economic lot scheduling problem
KW - imperfect production system
KW - lot sizing
KW - two key modules
UR - http://www.scopus.com/inward/record.url?scp=85019844451&partnerID=8YFLogxK
U2 - 10.1016/j.promfg.2015.11.011
DO - 10.1016/j.promfg.2015.11.011
M3 - 文章
AN - SCOPUS:85019844451
SN - 2351-9789
VL - 4
SP - 30
EP - 37
JO - Procedia Manufacturing
JF - Procedia Manufacturing
ER -