Period-dependent initial values for exact schedulability test of rate monotonic systems

Wan Chen Lu*, Kwei Jay Lin, Hsin Wen Wei, Wei Kuan Shih

*此作品的通信作者

研究成果: 圖書/報告稿件的類型會議稿件同行評審

10 引文 斯高帕斯(Scopus)

摘要

Real-time systems using Rate Monotonic fixed priority scheduling can be checked for schedulability either by pessimistic schedulability conditions or exact testing. Exact testing provides a more precise result but cannot always be performed in polynomial time. Audsley et al. proposed one of the earliest methods by iteratively deriving the job response times. Other researchers have improved the efficiency of their exact test method by using different initial values. All currently proposed initial values do not use the relationship between task periods. In this paper we define initial values using the largest and the second largest periods in a system. We show that the new initial values can significantly improve the exact test.

原文英語
主出版物標題Proceedings - 21st International Parallel and Distributed Processing Symposium, IPDPS 2007; Abstracts and CD-ROM
DOIs
出版狀態已出版 - 2007
對外發佈
事件21st International Parallel and Distributed Processing Symposium, IPDPS 2007 - Long Beach, CA, 美國
持續時間: 26 03 200730 03 2007

出版系列

名字Proceedings - 21st International Parallel and Distributed Processing Symposium, IPDPS 2007; Abstracts and CD-ROM

Conference

Conference21st International Parallel and Distributed Processing Symposium, IPDPS 2007
國家/地區美國
城市Long Beach, CA
期間26/03/0730/03/07

指紋

深入研究「Period-dependent initial values for exact schedulability test of rate monotonic systems」主題。共同形成了獨特的指紋。

引用此