摘要
In this paper, firstly we discuss the architecture of a flexible automated production system under which all components are well-modulized. Then, a solution, EMFAK (Event-driven Multi-tasking Flexible Automation Kernel) is proposed to speed up the construction of system control. At last, a flexible assembly system using EMFAK is described to show how to apply it to a real flexible automated production system.
原文 | 英語 |
---|---|
頁(從 - 到) | 1517-1522 |
頁數 | 6 |
期刊 | Proceedings - IEEE International Conference on Robotics and Automation |
卷 | 2 |
出版狀態 | 已出版 - 1997 |
對外發佈 | 是 |
事件 | Proceedings of the 1997 IEEE International Conference on Robotics and Automation, ICRA. Part 3 (of 4) - Albuquerque, NM, USA 持續時間: 20 04 1997 → 25 04 1997 |