摘要
This study investigates a multi-project, multi-period, multi-factory and multi-objective supplier selection problem with project life cycles and demand uncertainty. For this problem, we establish a multi-stage mixed integer stochastic programming model with three objectives (i.e., the procurement cost, number of quality defects and delayed delivery quantity). An adapted chaos optimization algorithm based on a maximum similarity method is developed to solve the model. The effectiveness of our solutions is validated by the real data from the auto industry.
| 原文 | 英語 |
|---|---|
| 文章編號 | 105312 |
| 期刊 | Computers and Operations Research |
| 卷 | 132 |
| DOIs | |
| 出版狀態 | 已出版 - 08 2021 |
文獻附註
Publisher Copyright:© 2021 Elsevier Ltd
指紋
深入研究「Supplier selection problem for multiple projects with uncertain demand and project life cycles」主題。共同形成了獨特的指紋。引用此
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver